I24EB US27 Offramp over A660 Chestnut ST
GoodHamilton County, Tennessee · .1 M E of I24/US27 JCT · Structure no. 33I00240017
- Built
- 2022
- 3 years old
- Condition
- Good
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 153 ft
- 3 main spans
- Daily traffic
- 105,057
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
I24EB US27 Offramp over A660 Chestnut ST is a prestressed concrete continuous stringer/multi-beam or girder carrying I24EB US27 Offramp over A660 Chestnut ST in Hamilton County, Tennessee. It was built in 2022, so it is 3 years old, younger than the Tennessee average of 47.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 105,057 vehicles a day, roughly 7% of them trucks, projected to reach 168,091 by 2042. The structure is 153 ft (46.7 m) long and 60 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I24EB US27 Offramp over A660 Chestnut ST built?
It was built in 2022, making it 3 years old in 2025.
What condition is I24EB US27 Offramp over A660 Chestnut ST in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.
How much traffic does I24EB US27 Offramp over A660 Chestnut ST carry?
About 105,057 vehicles per day (2021 count), of which roughly 7% are trucks.
How long is I24EB US27 Offramp over A660 Chestnut ST?
The structure is 153 ft (46.7 m) long with a longest span of 82 ft (25.1 m) and a deck 60 ft wide.
Who owns I24EB US27 Offramp over A660 Chestnut ST?
It is owned by the State Highway Agency.