FAU 4132 over Wolftever Creek
GoodHamilton County, Tennessee · 1.5 MI E of TN317/321 JCT · Structure no. 330E0110003
- Built
- 2022
- 3 years old
- Condition
- Good
- inspected March 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 306 ft
- 5 main spans
- Daily traffic
- 4,981
- 2021 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
FAU 4132 over Wolftever Creek is a prestressed concrete continuous stringer/multi-beam or girder carrying FAU 4132 over Wolftever Creek in Hamilton County, Tennessee. It was built in 2022, so it is 3 years old, younger than the Tennessee average of 47.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 4,981 vehicles a day, roughly 3% of them trucks, projected to reach 7,970 by 2042. The structure is 306 ft (93.2 m) long and 64 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAU 4132 over Wolftever Creek built?
It was built in 2022, making it 3 years old in 2025.
What condition is FAU 4132 over Wolftever Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.
How much traffic does FAU 4132 over Wolftever Creek carry?
About 4,981 vehicles per day (2021 count), of which roughly 3% are trucks.
How long is FAU 4132 over Wolftever Creek?
The structure is 306 ft (93.2 m) long with a longest span of 66 ft (20.1 m) and a deck 64 ft wide.
Who owns FAU 4132 over Wolftever Creek?
It is owned by the City or Municipal Highway Agency.