US Bridges

FAP 160 over Southern Railway

Fair

Hamblen County, Tennessee · 5 MI SW of JCT SR32&SR160 · Structure no. 32SR1600021

Built
1992
33 years old
Condition
Fair
inspected March 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
174 ft
3 main spans
Daily traffic
20,599
2021 count
Owner
State
State Highway Agency

About this bridge

FAP 160 over Southern Railway is a prestressed concrete continuous stringer/multi-beam or girder carrying FAP 160 over Southern Railway in Hamblen County, Tennessee. It was built in 1992, so it is 33 years old, younger than the Tennessee average of 47.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 20,599 vehicles a day, roughly 9% of them trucks, projected to reach 31,440 by 2040. The structure is 174 ft (52.9 m) long and 44 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesFAP 160
CrossesSouthern Railway
Location5 MI SW of JCT SR32&SR160
RouteState Highway 160
Coordinates36.18818, -83.3064
Functional classUrban Other Principal Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating43.7 US tons
Inventory rating25.8 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length174 ft (52.9 m)
Longest span56 ft (17 m)
Deck width44 ft (13.4 m)
Roadway width40 ft (12.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic20,599 (2021)
Projected traffic31,440 by 2040
Trucks9%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesRailroad
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was FAP 160 over Southern Railway built?

It was built in 1992, making it 33 years old in 2025.

What condition is FAP 160 over Southern Railway in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.

How much traffic does FAP 160 over Southern Railway carry?

About 20,599 vehicles per day (2021 count), of which roughly 9% are trucks.

How long is FAP 160 over Southern Railway?

The structure is 174 ft (52.9 m) long with a longest span of 56 ft (17 m) and a deck 44 ft wide.

Who owns FAP 160 over Southern Railway?

It is owned by the State Highway Agency.