US Bridges

I81 over Nfa A506

Fair

Hamblen County, Tennessee · NB27M.FROM Jefferson Co.L · Structure no. 32I00810027

Built
1972
53 years old
Condition
Fair
inspected March 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
173 ft
3 main spans
Daily traffic
45,697
2021 count
Owner
State
State Highway Agency

About this bridge

I81 over Nfa A506 is a prestressed concrete continuous stringer/multi-beam or girder carrying I81 over Nfa A506 in Hamblen County, Tennessee. It was built in 1972, so it is 53 years old, older than the Tennessee average of 47.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 45,697 vehicles a day, roughly 6% of them trucks, projected to reach 65,512 by 2042. The structure is 173 ft (52.6 m) long and 42 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI81
CrossesNfa A506
LocationNB27M.FROM Jefferson Co.L
RouteInterstate 81
Coordinates36.18352, -83.19327
Functional classRural Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating47.2 US tons
Inventory rating34 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, precast panels
Main spans3
Design loadHS 20
Structure length173 ft (52.6 m)
Longest span58 ft (17.6 m)
Deck width42 ft (12.9 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic45,697 (2021)
Projected traffic65,512 by 2042
Trucks6%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I81 over Nfa A506 built?

It was built in 1972, making it 53 years old in 2025.

What condition is I81 over Nfa A506 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.

How much traffic does I81 over Nfa A506 carry?

About 45,697 vehicles per day (2021 count), of which roughly 6% are trucks.

How long is I81 over Nfa A506?

The structure is 173 ft (52.6 m) long with a longest span of 58 ft (17.6 m) and a deck 42 ft wide.

Who owns I81 over Nfa A506?

It is owned by the State Highway Agency.