US Bridges

Nfa A073 over Big Creek

Fair

Grundy County, Tennessee · City of Altamont · Structure no. 310A0730001

Built
1934
91 years old
Condition
Fair
inspected June 2024
Type
Tee Beam
Concrete
Length
99 ft
3 main spans
Daily traffic
50
2020 count
Owner
City
City or Municipal Highway Agency

About this bridge

Nfa A073 over Big Creek is a concrete tee beam carrying Nfa A073 over Big Creek in Grundy County, Tennessee. It was built in 1934, so it is 91 years old, older than the Tennessee average of 47.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 50 vehicles a day, roughly 2% of them trucks, projected to reach 80 by 2040. The structure is 99 ft (30.2 m) long and 27 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesNfa A073
CrossesBig Creek
LocationCity of Altamont
RouteCity Street 73
Coordinates35.41322, -85.7058
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection3 SeriousLoss of section, deterioration, spalling or scour have seriously affected primary structural components.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating66.5 US tons
Inventory rating35.7 US tons

Structure

Structure typeTee Beam
MaterialConcrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length99 ft (30.2 m)
Longest span33 ft (10.1 m)
Deck width27 ft (8.3 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (2020)
Projected traffic80 by 2040
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Nfa A073 over Big Creek built?

It was built in 1934, making it 91 years old in 2025.

What condition is Nfa A073 over Big Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.

How much traffic does Nfa A073 over Big Creek carry?

About 50 vehicles per day (2020 count), of which roughly 2% are trucks.

How long is Nfa A073 over Big Creek?

The structure is 99 ft (30.2 m) long with a longest span of 33 ft (10.1 m) and a deck 27 ft wide.

Who owns Nfa A073 over Big Creek?

It is owned by the City or Municipal Highway Agency.