FAP 7 over SR 7 / I65
FairPosted for loadGiles County, Tennessee · In Ardmore City Limits · Structure no. 28I00650003
- Built
- 1958
- 67 years old, rebuilt 1994
- Condition
- Fair
- inspected November 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 307 ft
- 4 main spans
- Daily traffic
- 7,801
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
FAP 7 over SR 7 / I65 is a steel continuous stringer/multi-beam or girder carrying FAP 7 over SR 7 / I65 in Giles County, Tennessee. It was built in 1958 and reconstructed in 1994, so it is 67 years old, older than the Tennessee average of 47.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 7,801 vehicles a day, roughly 5% of them trucks, projected to reach 11,981 by 2042. The structure is 307 ft (93.5 m) long and 34 ft wide. If it were closed, the detour would be 14.9 mi (24 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAP 7 over SR 7 / I65 built?
It was built in 1958, making it 67 years old in 2025. It was reconstructed in 1994.
What condition is FAP 7 over SR 7 / I65 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.
How much traffic does FAP 7 over SR 7 / I65 carry?
About 7,801 vehicles per day (2021 count), of which roughly 5% are trucks.
How long is FAP 7 over SR 7 / I65?
The structure is 307 ft (93.5 m) long with a longest span of 108 ft (33 m) and a deck 34 ft wide.
Who owns FAP 7 over SR 7 / I65?
It is owned by the State Highway Agency.