FAP 76 over Rutherford Fk.Obion Rive
GoodGibson County, Tennessee · 1.9 Mi.E.Of Milan · Structure no. 27SR0760020
- Built
- 2013
- 12 years old
- Condition
- Good
- inspected June 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 480 ft
- 6 main spans
- Daily traffic
- 7,461
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
FAP 76 over Rutherford Fk.Obion Rive is a prestressed concrete continuous stringer/multi-beam or girder carrying FAP 76 over Rutherford Fk.Obion Rive in Gibson County, Tennessee. It was built in 2013, so it is 12 years old, younger than the Tennessee average of 47.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 7,461 vehicles a day, roughly 10% of them trucks, projected to reach 11,938 by 2042. The structure is 480 ft (146.3 m) long and 44 ft wide. If it were closed, the detour would be 41 mi (66 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAP 76 over Rutherford Fk.Obion Rive built?
It was built in 2013, making it 12 years old in 2025.
What condition is FAP 76 over Rutherford Fk.Obion Rive in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.
How much traffic does FAP 76 over Rutherford Fk.Obion Rive carry?
About 7,461 vehicles per day (2021 count), of which roughly 10% are trucks.
How long is FAP 76 over Rutherford Fk.Obion Rive?
The structure is 480 ft (146.3 m) long with a longest span of 80 ft (24.5 m) and a deck 44 ft wide.
Who owns FAP 76 over Rutherford Fk.Obion Rive?
It is owned by the State Highway Agency.