US Bridges

FAP 76 over Branch

Good

Gibson County, Tennessee · In Milan City Limits · Structure no. 27SR0760017

Built
2013
12 years old
Condition
Good
inspected June 2023
Type
Culvert
Concrete Continuous
Length
28 ft
2 main spans
Daily traffic
8,087
2021 count
Owner
State
State Highway Agency

About this bridge

FAP 76 over Branch is a concrete continuous culvert carrying FAP 76 over Branch in Gibson County, Tennessee. It was built in 2013, so it is 12 years old, younger than the Tennessee average of 47.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 8,087 vehicles a day, roughly 9% of them trucks, projected to reach 12,939 by 2042. The structure is 28 ft (8.5 m) long. If it were closed, the detour would be 44.7 mi (72 km).

CarriesFAP 76
CrossesBranch
LocationIn Milan City Limits
RouteU.S. Route 70
Coordinates35.92937, -88.73603
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.6 US tons
Inventory rating35.7 US tons

Structure

Structure typeCulvert
MaterialConcrete Continuous
DeckNot applicable
Main spans2
Design loadHS 20
Structure length28 ft (8.5 m)
Longest span12 ft (3.7 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic8,087 (2021)
Projected traffic12,939 by 2042
Trucks9%
Lanes on structure5
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed44.7 mi (72 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$1 million (2022 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was FAP 76 over Branch built?

It was built in 2013, making it 12 years old in 2025.

What condition is FAP 76 over Branch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does FAP 76 over Branch carry?

About 8,087 vehicles per day (2021 count), of which roughly 9% are trucks.

How long is FAP 76 over Branch?

The structure is 28 ft (8.5 m) long with a longest span of 12 ft (3.7 m).

Who owns FAP 76 over Branch?

It is owned by the State Highway Agency.