FAP 59 over Drainage Ditch

Fair

Fayette County, Tennessee · 6.7 Miles East of Braden · Structure no. 24SR0590015

Built
1998
27 years old
Condition
Fair
inspected August 2024
Type
Culvert
Concrete Continuous
Length
51 ft
3 main spans
Daily traffic
1,813
2021 count
Owner
State
State Highway Agency

About this bridge

FAP 59 over Drainage Ditch is a concrete continuous culvert carrying FAP 59 over Drainage Ditch in Fayette County, Tennessee. It was built in 1998, so it is 27 years old, younger than the Tennessee average of 47.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 1,813 vehicles a day, roughly 5% of them trucks, projected to reach 2,901 by 2042. The structure is 51 ft (15.5 m) long and 64 ft wide. If it were closed, the detour would be 51 mi (82 km).

CarriesFAP 59
CrossesDrainage Ditch
Location6.7 Miles East of Braden
RouteState Highway 59
Coordinates35.29942, -89.38956
Functional classRural Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating78.6 US tons
Inventory rating35.7 US tons

Structure

Structure typeCulvert
MaterialConcrete Continuous
DeckNot applicable
Main spans3
Design loadHS 20
Structure length51 ft (15.5 m)
Longest span15 ft (4.7 m)
Deck width64 ft (19.6 m)
Roadway width62 ft (19 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,813 (2021)
Projected traffic2,901 by 2042
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed51 mi (82 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FAP 59 over Drainage Ditch built?

It was built in 1998, making it 27 years old in 2025.

What condition is FAP 59 over Drainage Ditch in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.

How much traffic does FAP 59 over Drainage Ditch carry?

About 1,813 vehicles per day (2021 count), of which roughly 5% are trucks.

How long is FAP 59 over Drainage Ditch?

The structure is 51 ft (15.5 m) long with a longest span of 15 ft (4.7 m) and a deck 64 ft wide.

Who owns FAP 59 over Drainage Ditch?

It is owned by the State Highway Agency.