US Bridges

Nfa A094 over London Creek

FairPosted for load

Fayette County, Tennessee · Caldwell Dr. · Structure no. 240A0940003

Built
1965
60 years old
Condition
Fair
inspected August 2024
Type
Channel Beam
Concrete
Length
39 ft
2 main spans
Daily traffic
40
2020 count
Owner
County
County Highway Agency

About this bridge

Nfa A094 over London Creek is a concrete channel beam carrying Nfa A094 over London Creek in Fayette County, Tennessee. It was built in 1965, so it is 60 years old, older than the Tennessee average of 47.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.

It carries about 40 vehicles a day, roughly 1% of them trucks, projected to reach 64 by 2041. The structure is 39 ft (11.9 m) long and 22 ft wide. If it were closed, the detour would be 6.2 mi (10 km).

CarriesNfa A094
CrossesLondon Creek
LocationCaldwell Dr.
RouteCounty Highway 94
Coordinates35.39536, -89.26639
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating32.8 US tons
Inventory rating25.4 US tons

Structure

Structure typeChannel Beam
MaterialConcrete
DeckConcrete, precast panels
Main spans2
Design loadH 15
Structure length39 ft (11.9 m)
Longest span19 ft (5.8 m)
Deck width22 ft (6.6 m)
Roadway width20 ft (6.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic40 (2020)
Projected traffic64 by 2041
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.2 mi (10 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$490,000 (2021 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was Nfa A094 over London Creek built?

It was built in 1965, making it 60 years old in 2025.

What condition is Nfa A094 over London Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.

How much traffic does Nfa A094 over London Creek carry?

About 40 vehicles per day (2020 count), of which roughly 1% are trucks.

How long is Nfa A094 over London Creek?

The structure is 39 ft (11.9 m) long with a longest span of 19 ft (5.8 m) and a deck 22 ft wide.

Who owns Nfa A094 over London Creek?

It is owned by the County Highway Agency.