Nfa A276 over Palestine Rd. / SR 3
GoodDyer County, Tennessee · 2.2 MI NW JCT SR77&SR211 · Structure no. 23SR0030031
- Built
- 1979
- 46 years old
- Condition
- Good
- inspected October 2023
- Type
- Box Beam or Girders - Single or Spread
- Concrete Continuous
- Length
- 334 ft
- 4 main spans
- Daily traffic
- 160
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
Nfa A276 over Palestine Rd. / SR 3 is a concrete continuous box beam or girders - single or spread carrying Nfa A276 over Palestine Rd. / SR 3 in Dyer County, Tennessee. It was built in 1979, so it is 46 years old, younger than the Tennessee average of 47.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 160 vehicles a day, roughly 4% of them trucks, projected to reach 256 by 2042. The structure is 334 ft (101.8 m) long and 32 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Nfa A276 over Palestine Rd. / SR 3 built?
It was built in 1979, making it 46 years old in 2025.
What condition is Nfa A276 over Palestine Rd. / SR 3 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.
How much traffic does Nfa A276 over Palestine Rd. / SR 3 carry?
About 160 vehicles per day (2020 count), of which roughly 4% are trucks.
How long is Nfa A276 over Palestine Rd. / SR 3?
The structure is 334 ft (101.8 m) long with a longest span of 126 ft (38.4 m) and a deck 32 ft wide.
Who owns Nfa A276 over Palestine Rd. / SR 3?
It is owned by the State Highway Agency.