US Bridges

FAP 408 (SR155) over SR 155/BUENA Vista Pk&cr

Good

Davidson County, Tennessee · SR 155/BUENA Vista Pk&cr · Structure no. 19SR1550043

Built
1992
33 years old
Condition
Good
inspected April 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete Continuous
Length
420 ft
6 main spans
Daily traffic
40,884
2021 count
Owner
State
State Highway Agency

About this bridge

FAP 408 (SR155) over SR 155/BUENA Vista Pk&cr is a prestressed concrete continuous box beam or girders - multiple carrying FAP 408 (SR155) over SR 155/BUENA Vista Pk&cr in Davidson County, Tennessee. It was built in 1992, so it is 33 years old, younger than the Tennessee average of 47.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 40,884 vehicles a day, roughly 7% of them trucks, projected to reach 70,678 by 2041. The structure is 420 ft (128 m) long and 90 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesFAP 408 (SR155)
CrossesSR 155/BUENA Vista Pk&cr
LocationSR 155/BUENA Vista Pk&cr
RouteState Highway 155
Coordinates36.23295, -86.8243
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating79.4 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans6
Design loadHS 20
Structure length420 ft (128 m)
Longest span80 ft (24.4 m)
Deck width90 ft (27.4 m)
Roadway width88 ft (26.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic40,884 (2021)
Projected traffic70,678 by 2041
Trucks7%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway and waterway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FAP 408 (SR155) over SR 155/BUENA Vista Pk&cr built?

It was built in 1992, making it 33 years old in 2025.

What condition is FAP 408 (SR155) over SR 155/BUENA Vista Pk&cr in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.

How much traffic does FAP 408 (SR155) over SR 155/BUENA Vista Pk&cr carry?

About 40,884 vehicles per day (2021 count), of which roughly 7% are trucks.

How long is FAP 408 (SR155) over SR 155/BUENA Vista Pk&cr?

The structure is 420 ft (128 m) long with a longest span of 80 ft (24.4 m) and a deck 90 ft wide.

Who owns FAP 408 (SR155) over SR 155/BUENA Vista Pk&cr?

It is owned by the State Highway Agency.