FAU 65 over Whites Creek
GoodDavidson County, Tennessee · 1.1 M S JCT SR45&SR65 · Structure no. 19SR0650003
- Built
- 1994
- 31 years old
- Condition
- Good
- inspected March 2023
- Type
- Box Beam or Girders - Single or Spread
- Prestressed Concrete Continuous
- Length
- 162 ft
- 3 main spans
- Daily traffic
- 4,461
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
FAU 65 over Whites Creek is a prestressed concrete continuous box beam or girders - single or spread carrying FAU 65 over Whites Creek in Davidson County, Tennessee. It was built in 1994, so it is 31 years old, younger than the Tennessee average of 47.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 4,461 vehicles a day, roughly 4% of them trucks, projected to reach 7,627 by 2041. The structure is 162 ft (49.4 m) long and 42 ft wide. If it were closed, the detour would be 59 mi (95 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAU 65 over Whites Creek built?
It was built in 1994, making it 31 years old in 2025.
What condition is FAU 65 over Whites Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.
How much traffic does FAU 65 over Whites Creek carry?
About 4,461 vehicles per day (2021 count), of which roughly 4% are trucks.
How long is FAU 65 over Whites Creek?
The structure is 162 ft (49.4 m) long with a longest span of 55 ft (16.8 m) and a deck 42 ft wide.
Who owns FAU 65 over Whites Creek?
It is owned by the State Highway Agency.