FAP 401 (sr 24) over SR 24 / Briley Pkwy
FairDavidson County, Tennessee · SR24/BRILEY Parkway · Structure no. 19SR0240017
- Built
- 2007
- 18 years old
- Condition
- Fair
- inspected March 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 216 ft
- 2 main spans
- Daily traffic
- 17,434
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
FAP 401 (sr 24) over SR 24 / Briley Pkwy is a prestressed concrete continuous stringer/multi-beam or girder carrying FAP 401 (sr 24) over SR 24 / Briley Pkwy in Davidson County, Tennessee. It was built in 2007, so it is 18 years old, younger than the Tennessee average of 47.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 17,434 vehicles a day, roughly 13% of them trucks, projected to reach 27,894 by 2042. The structure is 216 ft (65.8 m) long and 104 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAP 401 (sr 24) over SR 24 / Briley Pkwy built?
It was built in 2007, making it 18 years old in 2025.
What condition is FAP 401 (sr 24) over SR 24 / Briley Pkwy in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.
How much traffic does FAP 401 (sr 24) over SR 24 / Briley Pkwy carry?
About 17,434 vehicles per day (2021 count), of which roughly 13% are trucks.
How long is FAP 401 (sr 24) over SR 24 / Briley Pkwy?
The structure is 216 ft (65.8 m) long with a longest span of 112 ft (34.1 m) and a deck 104 ft wide.
Who owns FAP 401 (sr 24) over SR 24 / Briley Pkwy?
It is owned by the State Highway Agency.