FAP 408 (sr 155) over Briley Pkwy/Brush Hill R
GoodDavidson County, Tennessee · 2.1 M S JCT SR6&SR45 · Structure no. 19S63260015
- Built
- 1963
- 62 years old, rebuilt 2005
- Condition
- Good
- inspected April 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 124 ft
- 3 main spans
- Daily traffic
- 71,975
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
FAP 408 (sr 155) over Briley Pkwy/Brush Hill R is a prestressed concrete continuous stringer/multi-beam or girder carrying FAP 408 (sr 155) over Briley Pkwy/Brush Hill R in Davidson County, Tennessee. It was built in 1963 and reconstructed in 2005, so it is 62 years old, older than the Tennessee average of 47.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 71,975 vehicles a day, roughly 7% of them trucks, projected to reach 152,848 by 2041. The structure is 124 ft (37.8 m) long and 156 ft wide. If it were closed, the detour would be 14.3 mi (23 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAP 408 (sr 155) over Briley Pkwy/Brush Hill R built?
It was built in 1963, making it 62 years old in 2025. It was reconstructed in 2005.
What condition is FAP 408 (sr 155) over Briley Pkwy/Brush Hill R in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.
How much traffic does FAP 408 (sr 155) over Briley Pkwy/Brush Hill R carry?
About 71,975 vehicles per day (2021 count), of which roughly 7% are trucks.
How long is FAP 408 (sr 155) over Briley Pkwy/Brush Hill R?
The structure is 124 ft (37.8 m) long with a longest span of 50 ft (15.2 m) and a deck 156 ft wide.
Who owns FAP 408 (sr 155) over Briley Pkwy/Brush Hill R?
It is owned by the State Highway Agency.