FAP 254 over Collins Creek
GoodDavidson County, Tennessee · .1 M W JCT SR254&I24 · Structure no. 19S61580007
- Built
- 1974
- 51 years old, rebuilt 1991
- Condition
- Good
- inspected April 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 58 ft
- 3 main spans
- Daily traffic
- 40,992
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
FAP 254 over Collins Creek is a prestressed concrete box beam or girders - multiple carrying FAP 254 over Collins Creek in Davidson County, Tennessee. It was built in 1974 and reconstructed in 1991, so it is 51 years old, older than the Tennessee average of 47.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 40,992 vehicles a day, roughly 7% of them trucks, projected to reach 66,440 by 2041. The structure is 58 ft (17.7 m) long and 91 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAP 254 over Collins Creek built?
It was built in 1974, making it 51 years old in 2025. It was reconstructed in 1991.
What condition is FAP 254 over Collins Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.
How much traffic does FAP 254 over Collins Creek carry?
About 40,992 vehicles per day (2021 count), of which roughly 7% are trucks.
How long is FAP 254 over Collins Creek?
The structure is 58 ft (17.7 m) long with a longest span of 12 ft (3.7 m) and a deck 91 ft wide.
Who owns FAP 254 over Collins Creek?
It is owned by the State Highway Agency.