US Bridges

FAP 408 (sr 155) over I65

Good

Davidson County, Tennessee · Briley Pk -I65 · Structure no. 19I00650131

Built
2000
25 years old
Condition
Good
inspected February 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
418 ft
2 main spans
Daily traffic
62,369
2021 count
Owner
State
State Highway Agency

About this bridge

FAP 408 (sr 155) over I65 is a steel continuous stringer/multi-beam or girder carrying FAP 408 (sr 155) over I65 in Davidson County, Tennessee. It was built in 2000, so it is 25 years old, younger than the Tennessee average of 47.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 62,369 vehicles a day, roughly 7% of them trucks, projected to reach 102,982 by 2042. The structure is 418 ft (127.3 m) long and 44 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesFAP 408 (sr 155)
CrossesI65
LocationBriley Pk -I65
RouteState Highway SR155
Coordinates36.24081, -86.75106
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating80.4 US tons
Inventory rating47.5 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length418 ft (127.3 m)
Longest span222 ft (67.7 m)
Deck width44 ft (13.4 m)
Roadway width42 ft (12.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic62,369 (2021)
Projected traffic102,982 by 2042
Trucks7%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was FAP 408 (sr 155) over I65 built?

It was built in 2000, making it 25 years old in 2025.

What condition is FAP 408 (sr 155) over I65 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does FAP 408 (sr 155) over I65 carry?

About 62,369 vehicles per day (2021 count), of which roughly 7% are trucks.

How long is FAP 408 (sr 155) over I65?

The structure is 418 ft (127.3 m) long with a longest span of 222 ft (67.7 m) and a deck 44 ft wide.

Who owns FAP 408 (sr 155) over I65?

It is owned by the State Highway Agency.