US Bridges

I65 over Wedgewood Avenue

Fair

Davidson County, Tennessee · I65/WEDEWOOD Ave · Structure no. 19I00650029

Built
1970
55 years old
Condition
Fair
inspected January 2024
Type
Frame
Steel Continuous
Length
155 ft
3 main spans
Daily traffic
107,707
2021 count
Owner
State
State Highway Agency

About this bridge

I65 over Wedgewood Avenue is a steel continuous frame carrying I65 over Wedgewood Avenue in Davidson County, Tennessee. It was built in 1970, so it is 55 years old, older than the Tennessee average of 47.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 107,707 vehicles a day, roughly 7% of them trucks, projected to reach 172,331 by 2042. The structure is 155 ft (47.2 m) long and 114 ft wide. If it were closed, the detour would be 9.9 mi (16 km).

CarriesI65
CrossesWedgewood Avenue
LocationI65/WEDEWOOD Ave
RouteInterstate I0065
Coordinates36.13416, -86.77533
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating47.6 US tons
Inventory rating27.8 US tons

Structure

Structure typeFrame
MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length155 ft (47.2 m)
Longest span71 ft (21.6 m)
Deck width114 ft (34.7 m)
Roadway width112 ft (34.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic107,707 (2021)
Projected traffic172,331 by 2042
Trucks7%
Lanes on structure6
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed9.9 mi (16 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedWidening of existing bridge without deck rehabilitation
Estimated improvement cost$2,000 (2022 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was I65 over Wedgewood Avenue built?

It was built in 1970, making it 55 years old in 2025.

What condition is I65 over Wedgewood Avenue in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.

How much traffic does I65 over Wedgewood Avenue carry?

About 107,707 vehicles per day (2021 count), of which roughly 7% are trucks.

How long is I65 over Wedgewood Avenue?

The structure is 155 ft (47.2 m) long with a longest span of 71 ft (21.6 m) and a deck 114 ft wide.

Who owns I65 over Wedgewood Avenue?

It is owned by the State Highway Agency.