FAU 5501 348025K over CSX RR & Richland Creek
GoodDavidson County, Tennessee · Nashville-Belle Meade LN · Structure no. 190D8960001
- Built
- 2019
- 6 years old
- Condition
- Good
- inspected July 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete Continuous
- Length
- 175 ft
- 3 main spans
- Daily traffic
- 4,109
- 2021 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
FAU 5501 348025K over CSX RR & Richland Creek is a prestressed concrete continuous box beam or girders - multiple carrying FAU 5501 348025K over CSX RR & Richland Creek in Davidson County, Tennessee. It was built in 2019, so it is 6 years old, younger than the Tennessee average of 47.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 4,109 vehicles a day, roughly 3% of them trucks, projected to reach 7,576 by 2041. The structure is 175 ft (53.3 m) long and 27 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAU 5501 348025K over CSX RR & Richland Creek built?
It was built in 2019, making it 6 years old in 2025.
What condition is FAU 5501 348025K over CSX RR & Richland Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.
How much traffic does FAU 5501 348025K over CSX RR & Richland Creek carry?
About 4,109 vehicles per day (2021 count), of which roughly 3% are trucks.
How long is FAU 5501 348025K over CSX RR & Richland Creek?
The structure is 175 ft (53.3 m) long with a longest span of 60 ft (18.3 m) and a deck 27 ft wide.
Who owns FAU 5501 348025K over CSX RR & Richland Creek?
It is owned by the City or Municipal Highway Agency.