US Bridges

FAU 4899 over Branch

Good

Davidson County, Tennessee · In Nashville · Structure no. 190D8330001

Built
1960
65 years old
Condition
Good
inspected April 2023
Type
Culvert
Concrete Continuous
Length
35 ft
2 main spans
Daily traffic
3,945
2021 count
Owner
City
City or Municipal Highway Agency

About this bridge

FAU 4899 over Branch is a concrete continuous culvert carrying FAU 4899 over Branch in Davidson County, Tennessee. It was built in 1960, so it is 65 years old, older than the Tennessee average of 47.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 3,945 vehicles a day, roughly 3% of them trucks, projected to reach 7,568 by 2041. The structure is 35 ft (10.7 m) long. If it were closed, the detour would be 1.9 mi (3 km).

CarriesFAU 4899
CrossesBranch
LocationIn Nashville
RouteCity Street 4899
Coordinates36.12563, -86.90263
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert7 GoodSome minor problems.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating37.8 US tons
Inventory rating22.8 US tons

Structure

Structure typeCulvert
MaterialConcrete Continuous
DeckNot applicable
Main spans2
Design loadHS 20
Structure length35 ft (10.7 m)
Longest span11 ft (3.4 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,945 (2021)
Projected traffic7,568 by 2041
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FAU 4899 over Branch built?

It was built in 1960, making it 65 years old in 2025.

What condition is FAU 4899 over Branch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.

How much traffic does FAU 4899 over Branch carry?

About 3,945 vehicles per day (2021 count), of which roughly 3% are trucks.

How long is FAU 4899 over Branch?

The structure is 35 ft (10.7 m) long with a longest span of 11 ft (3.4 m).

Who owns FAU 4899 over Branch?

It is owned by the City or Municipal Highway Agency.