US Bridges

FAU 4845 over Indian Creek

Good

Davidson County, Tennessee · In Nashville · Structure no. 190A5900001

Built
1940
85 years old
Condition
Good
inspected May 2023
Type
Tee Beam
Concrete
Length
39 ft
1 main span
Daily traffic
2,691
2021 count
Owner
City
City or Municipal Highway Agency

About this bridge

FAU 4845 over Indian Creek is a concrete tee beam carrying FAU 4845 over Indian Creek in Davidson County, Tennessee. It was built in 1940, so it is 85 years old, older than the Tennessee average of 47.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,691 vehicles a day, roughly 3% of them trucks, projected to reach 5,056 by 2041. The structure is 39 ft (11.9 m) long and 28 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesFAU 4845
CrossesIndian Creek
LocationIn Nashville
RouteCounty Highway 4845
Coordinates36.01433, -86.67844
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.5 US tons
Inventory rating35.7 US tons

Structure

Structure typeTee Beam
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length39 ft (11.9 m)
Longest span36 ft (11 m)
Deck width28 ft (8.4 m)
Roadway width24 ft (7.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,691 (2021)
Projected traffic5,056 by 2041
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedWidening of existing bridge without deck rehabilitation
Estimated improvement cost$221,000 (2021 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was FAU 4845 over Indian Creek built?

It was built in 1940, making it 85 years old in 2025.

What condition is FAU 4845 over Indian Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does FAU 4845 over Indian Creek carry?

About 2,691 vehicles per day (2021 count), of which roughly 3% are trucks.

How long is FAU 4845 over Indian Creek?

The structure is 39 ft (11.9 m) long with a longest span of 36 ft (11 m) and a deck 28 ft wide.

Who owns FAU 4845 over Indian Creek?

It is owned by the City or Municipal Highway Agency.