US Bridges

FAU 4876 over Branch

Good

Davidson County, Tennessee · 2 M N I40 @ Lakewood · Structure no. 19048760001

Built
2000
25 years old
Condition
Good
inspected May 2023
Type
Culvert
Concrete Continuous
Length
40 ft
3 main spans
Daily traffic
9,028
2021 count
Owner
City
City or Municipal Highway Agency

About this bridge

FAU 4876 over Branch is a concrete continuous culvert carrying FAU 4876 over Branch in Davidson County, Tennessee. It was built in 2000, so it is 25 years old, younger than the Tennessee average of 47.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 9,028 vehicles a day, projected to reach 13,424 by 2041. The structure is 40 ft (12.2 m) long. If it were closed, the detour would be 6.2 mi (10 km).

CarriesFAU 4876
CrossesBranch
Location2 M N I40 @ Lakewood
RouteCity Street 4876
Coordinates36.21447, -86.58852
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert7 GoodSome minor problems.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.5 US tons
Inventory rating35.7 US tons

Structure

Structure typeCulvert
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length40 ft (12.2 m)
Longest span12 ft (3.7 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic9,028 (2021)
Projected traffic13,424 by 2041
Trucks0%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed6.2 mi (10 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FAU 4876 over Branch built?

It was built in 2000, making it 25 years old in 2025.

What condition is FAU 4876 over Branch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does FAU 4876 over Branch carry?

About 9,028 vehicles per day (2021 count).

How long is FAU 4876 over Branch?

The structure is 40 ft (12.2 m) long with a longest span of 12 ft (3.7 m).

Who owns FAU 4876 over Branch?

It is owned by the City or Municipal Highway Agency.