I24 Ebl over Duck River
FairCoffee County, Tennessee · Near Manchester · Structure no. 16I00240021
- Built
- 1966
- 59 years old, rebuilt 1992
- Condition
- Fair
- inspected October 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 253 ft
- 3 main spans
- Daily traffic
- 39,094
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
I24 Ebl over Duck River is a steel continuous stringer/multi-beam or girder carrying I24 Ebl over Duck River in Coffee County, Tennessee. It was built in 1966 and reconstructed in 1992, so it is 59 years old, older than the Tennessee average of 47.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 39,094 vehicles a day, roughly 6% of them trucks, projected to reach 75,824 by 2039. The structure is 253 ft (77.2 m) long and 44 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I24 Ebl over Duck River built?
It was built in 1966, making it 59 years old in 2025. It was reconstructed in 1992.
What condition is I24 Ebl over Duck River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.
How much traffic does I24 Ebl over Duck River carry?
About 39,094 vehicles per day (2021 count), of which roughly 6% are trucks.
How long is I24 Ebl over Duck River?
The structure is 253 ft (77.2 m) long with a longest span of 99 ft (30.2 m) and a deck 44 ft wide.
Who owns I24 Ebl over Duck River?
It is owned by the State Highway Agency.