US Bridges

FAP 52 over Overflow & Kyle ST (A290

Fair

Clay County, Tennessee · In Celina · Structure no. 14SR0520013

Built
1987
38 years old
Condition
Fair
inspected April 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
306 ft
5 main spans
Daily traffic
6,000
2021 count
Owner
State
State Highway Agency

About this bridge

FAP 52 over Overflow & Kyle ST (A290 is a prestressed concrete continuous stringer/multi-beam or girder carrying FAP 52 over Overflow & Kyle ST (A290 in Clay County, Tennessee. It was built in 1987, so it is 38 years old, younger than the Tennessee average of 47.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 6,000 vehicles a day, roughly 10% of them trucks, projected to reach 9,600 by 2042. The structure is 306 ft (93.3 m) long and 50 ft wide. If it were closed, the detour would be 67.7 mi (109 km).

CarriesFAP 52
CrossesOverflow & Kyle ST (A290
LocationIn Celina
RouteState Highway 52
Coordinates36.5522, -85.51041
Functional classRural Principal Arterial - Other

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations on dry land well above flood water elevations
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry9: Superior to present desirable criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating80.4 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, precast panels
Main spans5
Design loadHS 20
Structure length306 ft (93.3 m)
Longest span62 ft (18.9 m)
Deck width50 ft (15.2 m)
Roadway width48 ft (14.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6,000 (2021)
Projected traffic9,600 by 2042
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway and waterway
Detour if closed67.7 mi (109 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FAP 52 over Overflow & Kyle ST (A290 built?

It was built in 1987, making it 38 years old in 2025.

What condition is FAP 52 over Overflow & Kyle ST (A290 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.

How much traffic does FAP 52 over Overflow & Kyle ST (A290 carry?

About 6,000 vehicles per day (2021 count), of which roughly 10% are trucks.

How long is FAP 52 over Overflow & Kyle ST (A290?

The structure is 306 ft (93.3 m) long with a longest span of 62 ft (18.9 m) and a deck 50 ft wide.

Who owns FAP 52 over Overflow & Kyle ST (A290?

It is owned by the State Highway Agency.