Nfa A199 over Dale Hollow Dam Spillway
FairClay County, Tennessee · 3.5MI SE of Celina Tn. · Structure no. 140A1990001
- Built
- 1943
- 82 years old, rebuilt 1983
- Condition
- Fair
- inspected September 2023
- Type
- Girder and Floorbeam System
- Steel
- Length
- 414 ft
- 6 main spans
- Daily traffic
- 136
- 2017 count
- Owner
- Federal
- Corps of Engineers (Civil)
About this bridge
Nfa A199 over Dale Hollow Dam Spillway is a steel girder and floorbeam system carrying Nfa A199 over Dale Hollow Dam Spillway in Clay County, Tennessee. It was built in 1943 and reconstructed in 1983, so it is 82 years old, older than the Tennessee average of 47.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 136 vehicles a day, roughly 1% of them trucks, projected to reach 200 by 2041. The structure is 414 ft (126.1 m) long and 20 ft wide. If it were closed, the detour would be 8.1 mi (13 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Nfa A199 over Dale Hollow Dam Spillway built?
It was built in 1943, making it 82 years old in 2025. It was reconstructed in 1983.
What condition is Nfa A199 over Dale Hollow Dam Spillway in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.
How much traffic does Nfa A199 over Dale Hollow Dam Spillway carry?
About 136 vehicles per day (2017 count), of which roughly 1% are trucks.
How long is Nfa A199 over Dale Hollow Dam Spillway?
The structure is 414 ft (126.1 m) long with a longest span of 63 ft (19.2 m) and a deck 20 ft wide.
Who owns Nfa A199 over Dale Hollow Dam Spillway?
It is owned by the Corps of Engineers (Civil).