US Bridges

FAS 200 over Overflow

Fair

Chester County, Tennessee · 3 Mi.East of SR005 Alt. · Structure no. 12S80610009

Built
2005
20 years old
Condition
Fair
inspected June 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
91 ft
1 main span
Daily traffic
1,833
2021 count
Owner
State
State Highway Agency

About this bridge

FAS 200 over Overflow is a prestressed concrete stringer/multi-beam or girder carrying FAS 200 over Overflow in Chester County, Tennessee. It was built in 2005, so it is 20 years old, younger than the Tennessee average of 47.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 1,833 vehicles a day, roughly 5% of them trucks, projected to reach 5,555 by 2041. The structure is 91 ft (27.7 m) long and 36 ft wide. If it were closed, the detour would be 8.7 mi (14 km).

CarriesFAS 200
CrossesOverflow
Location3 Mi.East of SR005 Alt.
RouteState Highway 200
Coordinates35.47611, -88.60472
Functional classRural Major Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating99.2 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHS 20
Structure length91 ft (27.7 m)
Longest span91 ft (27.7 m)
Deck width36 ft (11.1 m)
Roadway width34 ft (10.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,833 (2021)
Projected traffic5,555 by 2041
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed8.7 mi (14 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FAS 200 over Overflow built?

It was built in 2005, making it 20 years old in 2025.

What condition is FAS 200 over Overflow in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.

How much traffic does FAS 200 over Overflow carry?

About 1,833 vehicles per day (2021 count), of which roughly 5% are trucks.

How long is FAS 200 over Overflow?

The structure is 91 ft (27.7 m) long with a longest span of 91 ft (27.7 m) and a deck 36 ft wide.

Who owns FAS 200 over Overflow?

It is owned by the State Highway Agency.