FAP 67 over Powder Branch
PoorCarter County, Tennessee · 3 M E. Washington CO LN · Structure no. 10SR0670031
- Built
- 1986
- 39 years old
- Condition
- Poor
- inspected June 2023
- Type
- Culvert
- Concrete Continuous
- Length
- 30 ft
- 2 main spans
- Daily traffic
- 24,080
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
FAP 67 over Powder Branch is a concrete continuous culvert carrying FAP 67 over Powder Branch in Carter County, Tennessee. It was built in 1986, so it is 39 years old, younger than the Tennessee average of 47.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
It carries about 24,080 vehicles a day, roughly 6% of them trucks, projected to reach 34,146 by 2041. The structure is 30 ft (9 m) long. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
| Culvert | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAP 67 over Powder Branch built?
It was built in 1986, making it 39 years old in 2025.
What condition is FAP 67 over Powder Branch in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in June 2023.
How much traffic does FAP 67 over Powder Branch carry?
About 24,080 vehicles per day (2021 count), of which roughly 6% are trucks.
How long is FAP 67 over Powder Branch?
The structure is 30 ft (9 m) long with a longest span of 13 ft (4 m).
Who owns FAP 67 over Powder Branch?
It is owned by the State Highway Agency.