Nfa E400 over East Fork of Poplar Cree
FairAnderson County, Tennessee · Montery RD · Structure no. 010E4000001
- Built
- 1968
- 57 years old
- Condition
- Fair
- inspected June 2023
- Type
- Box Beam or Girders - Multiple
- Concrete
- Length
- 85 ft
- 2 main spans
- Daily traffic
- 190
- 2020 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Nfa E400 over East Fork of Poplar Cree is a concrete box beam or girders - multiple carrying Nfa E400 over East Fork of Poplar Cree in Anderson County, Tennessee. It was built in 1968, so it is 57 years old, older than the Tennessee average of 47.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 190 vehicles a day, roughly 1% of them trucks, projected to reach 304 by 2041. The structure is 85 ft (25.8 m) long and 29 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Nfa E400 over East Fork of Poplar Cree built?
It was built in 1968, making it 57 years old in 2025.
What condition is Nfa E400 over East Fork of Poplar Cree in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.
How much traffic does Nfa E400 over East Fork of Poplar Cree carry?
About 190 vehicles per day (2020 count), of which roughly 1% are trucks.
How long is Nfa E400 over East Fork of Poplar Cree?
The structure is 85 ft (25.8 m) long with a longest span of 43 ft (13 m) and a deck 29 ft wide.
Who owns Nfa E400 over East Fork of Poplar Cree?
It is owned by the City or Municipal Highway Agency.