Thunder Butte Road over Moreau Rv
FairZiebach County, South Dakota · 11.2 N 4.2 W Dupree · Structure no. 000000069158178
- Built
- 1969
- 56 years old
- Condition
- Fair
- inspected July 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 334 ft
- 3 main spans
- Daily traffic
- 143
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
Thunder Butte Road over Moreau Rv is a steel stringer/multi-beam or girder carrying Thunder Butte Road over Moreau Rv in Ziebach County, South Dakota. It was built in 1969, so it is 56 years old, older than the South Dakota average of 48.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 143 vehicles a day, roughly 3% of them trucks, projected to reach 143 by 2032. The structure is 334 ft (101.8 m) long and 30 ft wide. If it were closed, the detour would be 11.8 mi (19 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Thunder Butte Road over Moreau Rv built?
It was built in 1969, making it 56 years old in 2025.
What condition is Thunder Butte Road over Moreau Rv in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.
How much traffic does Thunder Butte Road over Moreau Rv carry?
About 143 vehicles per day (2022 count), of which roughly 3% are trucks.
How long is Thunder Butte Road over Moreau Rv?
The structure is 334 ft (101.8 m) long with a longest span of 130 ft (39.6 m) and a deck 30 ft wide.
Who owns Thunder Butte Road over Moreau Rv?
It is owned by the County Highway Agency.