US Bridges

IRR BIA RTE 6 over Ash Creek

Good

Ziebach County, South Dakota · 19KM West of Cherry Creek · Structure no. 00000000000A015

Built
1968
57 years old, rebuilt 2005
Condition
Good
inspected May 2023
Type
Tee Beam
Prestressed Concrete
Length
105 ft
3 main spans
Daily traffic
814
2023 count
Owner
Federal
Bureau of Indian Affairs

About this bridge

IRR BIA RTE 6 over Ash Creek is a prestressed concrete tee beam carrying IRR BIA RTE 6 over Ash Creek in Ziebach County, South Dakota. It was built in 1968 and reconstructed in 2005, so it is 57 years old, older than the South Dakota average of 48.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 814 vehicles a day, roughly 7% of them trucks, projected to reach 368 by 2043. The structure is 105 ft (32.1 m) long and 31 ft wide. If it were closed, the detour would be 6.2 mi (10 km).

CarriesIRR BIA RTE 6
CrossesAsh Creek
Location19KM West of Cherry Creek
RouteFederal Lands Road 6
Coordinates44.69512, -101.66238
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating86.2 US tons
Inventory rating42.2 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans3
Design loadHS 20
Structure length105 ft (32.1 m)
Longest span42 ft (12.9 m)
Deck width31 ft (9.3 m)
Roadway width29 ft (8.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic814 (2023)
Projected traffic368 by 2043
Trucks7%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.2 mi (10 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerBureau of Indian Affairs
Maintained byBureau of Indian Affairs
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was IRR BIA RTE 6 over Ash Creek built?

It was built in 1968, making it 57 years old in 2025. It was reconstructed in 2005.

What condition is IRR BIA RTE 6 over Ash Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does IRR BIA RTE 6 over Ash Creek carry?

About 814 vehicles per day (2023 count), of which roughly 7% are trucks.

How long is IRR BIA RTE 6 over Ash Creek?

The structure is 105 ft (32.1 m) long with a longest span of 42 ft (12.9 m) and a deck 31 ft wide.

Who owns IRR BIA RTE 6 over Ash Creek?

It is owned by the Bureau of Indian Affairs.