US Bridges

30620 475th Ave over Ck

Good

Union County, South Dakota · 4W & 5.2S Alcester · Structure no. 000000064050092

Built
2022
3 years old
Condition
Good
inspected August 2024
Type
Culvert
Concrete
Length
29 ft
2 main spans
Daily traffic
125
2022 count
Owner
County
County Highway Agency

About this bridge

30620 475th Ave over Ck is a concrete culvert carrying 30620 475th Ave over Ck in Union County, South Dakota. It was built in 2022, so it is 3 years old, younger than the South Dakota average of 48.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 125 vehicles a day, roughly 3% of them trucks, projected to reach 125 by 2032. The structure is 29 ft (8.7 m) long and 28 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

Carries30620 475th Ave
CrossesCk
Location4W & 5.2S Alcester
RouteCounty Highway 0
Coordinates42.95148, -96.70677
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection9 ExcellentNo problems noted.
Culvert9 ExcellentNo problems noted.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation9: Superior to present desirable criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment9: Superior to present desirable criteria
Operating rating50.8 US tons
Inventory rating39.4 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadHL 93
Structure length29 ft (8.7 m)
Longest span14 ft (4.3 m)
Deck width28 ft (8.5 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic125 (2022)
Projected traffic125 by 2032
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was 30620 475th Ave over Ck built?

It was built in 2022, making it 3 years old in 2025.

What condition is 30620 475th Ave over Ck in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.

How much traffic does 30620 475th Ave over Ck carry?

About 125 vehicles per day (2022 count), of which roughly 3% are trucks.

How long is 30620 475th Ave over Ck?

The structure is 29 ft (8.7 m) long with a longest span of 14 ft (4.3 m) and a deck 28 ft wide.

Who owns 30620 475th Ave over Ck?

It is owned by the County Highway Agency.