US Bridges

29690 458th Ave over Ck

Good

Turner County, South Dakota · 2E & 5.9S Viborg · Structure no. 000000063180289

Built
2002
23 years old
Condition
Good
inspected September 2024
Type
Tee Beam
Prestressed Concrete
Length
41 ft
1 main span
Daily traffic
97
2022 count
Owner
County
County Highway Agency

About this bridge

29690 458th Ave over Ck is a prestressed concrete tee beam carrying 29690 458th Ave over Ck in Turner County, South Dakota. It was built in 2002, so it is 23 years old, younger than the South Dakota average of 48.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 97 vehicles a day, roughly 2% of them trucks, projected to reach 97 by 2032. The structure is 41 ft (12.4 m) long and 23 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

Carries29690 458th Ave
CrossesCk
Location2E & 5.9S Viborg
RouteCounty Highway 0
Coordinates43.08499, -97.04225
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourUnknown foundation; not evaluated for scour
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadUnknown
Structure length41 ft (12.4 m)
Longest span39 ft (12 m)
Deck width23 ft (7.1 m)
Roadway width21 ft (6.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic97 (2022)
Projected traffic97 by 2032
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$23,000
NavigationNo navigation control on waterway

Frequently asked questions

When was 29690 458th Ave over Ck built?

It was built in 2002, making it 23 years old in 2025.

What condition is 29690 458th Ave over Ck in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does 29690 458th Ave over Ck carry?

About 97 vehicles per day (2022 count), of which roughly 2% are trucks.

How long is 29690 458th Ave over Ck?

The structure is 41 ft (12.4 m) long with a longest span of 39 ft (12 m) and a deck 23 ft wide.

Who owns 29690 458th Ave over Ck?

It is owned by the County Highway Agency.