3rd Street West over Turtle Creek
GoodSpink County, South Dakota · 7th Street E of Redfield · Structure no. 000000058099251
- Built
- 2017
- 8 years old
- Condition
- Good
- inspected October 2024
- Type
- Tee Beam
- Prestressed Concrete
- Length
- 42 ft
- 1 main span
- Daily traffic
- 24
- 2022 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
3rd Street West over Turtle Creek is a prestressed concrete tee beam carrying 3rd Street West over Turtle Creek in Spink County, South Dakota. It was built in 2017, so it is 8 years old, younger than the South Dakota average of 48.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 24 vehicles a day, roughly 2% of them trucks, projected to reach 24 by 2032. The structure is 42 ft (12.8 m) long and 23 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was 3rd Street West over Turtle Creek built?
It was built in 2017, making it 8 years old in 2025.
What condition is 3rd Street West over Turtle Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.
How much traffic does 3rd Street West over Turtle Creek carry?
About 24 vehicles per day (2022 count), of which roughly 2% are trucks.
How long is 3rd Street West over Turtle Creek?
The structure is 42 ft (12.8 m) long with a longest span of 42 ft (12.8 m) and a deck 23 ft wide.
Who owns 3rd Street West over Turtle Creek?
It is owned by the Town or Township Highway Agency.