US Bridges

Aspen Blvd HWY 138 over Split Rock Creek

Fair

Minnehaha County, South Dakota · 0.6E & 0.5S Brandon · Structure no. 000000050286180

Built
1988
37 years old
Condition
Fair
inspected June 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
217 ft
3 main spans
Daily traffic
7,782
2023 count
Owner
County
County Highway Agency

About this bridge

Aspen Blvd HWY 138 over Split Rock Creek is a prestressed concrete stringer/multi-beam or girder carrying Aspen Blvd HWY 138 over Split Rock Creek in Minnehaha County, South Dakota. It was built in 1988, so it is 37 years old, younger than the South Dakota average of 48.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 7,782 vehicles a day, roughly 5% of them trucks, projected to reach 9,034 by 2038. The structure is 217 ft (66.1 m) long and 43 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesAspen Blvd HWY 138
CrossesSplit Rock Creek
Location0.6E & 0.5S Brandon
RouteCounty Highway 0
Coordinates43.58711, -96.56154
Functional classRural Major Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation4: Meets minimum tolerable limits to be left in place as is
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating36 US tons
Inventory rating21.6 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length217 ft (66.1 m)
Longest span75 ft (22.9 m)
Deck width43 ft (13 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic7,782 (2023)
Projected traffic9,034 by 2038
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$2.3 million (2018 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was Aspen Blvd HWY 138 over Split Rock Creek built?

It was built in 1988, making it 37 years old in 2025.

What condition is Aspen Blvd HWY 138 over Split Rock Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.

How much traffic does Aspen Blvd HWY 138 over Split Rock Creek carry?

About 7,782 vehicles per day (2023 count), of which roughly 5% are trucks.

How long is Aspen Blvd HWY 138 over Split Rock Creek?

The structure is 217 ft (66.1 m) long with a longest span of 75 ft (22.9 m) and a deck 43 ft wide.

Who owns Aspen Blvd HWY 138 over Split Rock Creek?

It is owned by the County Highway Agency.