US Bridges

255th Street over West Pipestone Creek

Fair

Minnehaha County, South Dakota · 6.5N & 0.2E Brandon · Structure no. 000000050282110

Built
1992
33 years old
Condition
Fair
inspected June 2024
Type
Slab
Concrete Continuous
Length
87 ft
3 main spans
Daily traffic
73
2022 count
Owner
County
County Highway Agency

About this bridge

255th Street over West Pipestone Creek is a concrete continuous slab carrying 255th Street over West Pipestone Creek in Minnehaha County, South Dakota. It was built in 1992, so it is 33 years old, younger than the South Dakota average of 48.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 73 vehicles a day, roughly 2% of them trucks, projected to reach 85 by 2037. The structure is 87 ft (26.5 m) long and 33 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

Carries255th Street
CrossesWest Pipestone Creek
Location6.5N & 0.2E Brandon
RouteCounty Highway 0
Coordinates43.68806, -96.56761
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry8: Equal to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating79.8 US tons
Inventory rating47.8 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length87 ft (26.5 m)
Longest span33 ft (10 m)
Deck width33 ft (10 m)
Roadway width32 ft (9.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic73 (2022)
Projected traffic85 by 2037
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$850,000 (2018 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was 255th Street over West Pipestone Creek built?

It was built in 1992, making it 33 years old in 2025.

What condition is 255th Street over West Pipestone Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.

How much traffic does 255th Street over West Pipestone Creek carry?

About 73 vehicles per day (2022 count), of which roughly 2% are trucks.

How long is 255th Street over West Pipestone Creek?

The structure is 87 ft (26.5 m) long with a longest span of 33 ft (10 m) and a deck 33 ft wide.

Who owns 255th Street over West Pipestone Creek?

It is owned by the County Highway Agency.