US Bridges

SD011 over Split Rock Ck

Good

Minnehaha County, South Dakota · 1.2 N I 90 Interch · Structure no. 000000050280152

Built
2004
21 years old
Condition
Good
inspected October 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
327 ft
3 main spans
Daily traffic
3,442
2024 count
Owner
State
State Highway Agency

About this bridge

SD011 over Split Rock Ck is a prestressed concrete continuous stringer/multi-beam or girder carrying SD011 over Split Rock Ck in Minnehaha County, South Dakota. It was built in 2004, so it is 21 years old, younger than the South Dakota average of 48.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 3,442 vehicles a day, roughly 11% of them trucks, projected to reach 5,332 by 2044. The structure is 327 ft (99.7 m) long and 43 ft wide.

CarriesSD011
CrossesSplit Rock Ck
Location1.2 N I 90 Interch
RouteState Highway 11
Coordinates43.628, -96.57171
Functional classRural Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating75.7 US tons
Inventory rating45.3 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 25 or greater
Structure length327 ft (99.7 m)
Longest span112 ft (34 m)
Deck width43 ft (13 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,442 (2024)
Projected traffic5,332 by 2044
Trucks11%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SD011 over Split Rock Ck built?

It was built in 2004, making it 21 years old in 2025.

What condition is SD011 over Split Rock Ck in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.

How much traffic does SD011 over Split Rock Ck carry?

About 3,442 vehicles per day (2024 count), of which roughly 11% are trucks.

How long is SD011 over Split Rock Ck?

The structure is 327 ft (99.7 m) long with a longest span of 112 ft (34 m) and a deck 43 ft wide.

Who owns SD011 over Split Rock Ck?

It is owned by the State Highway Agency.