US Bridges

250th ST HWY 114 over Silver Creek

Good

Minnehaha County, South Dakota · 0.5E Baltic · Structure no. 000000050205060

Built
2019
6 years old
Condition
Good
inspected July 2021
Type
Culvert
Concrete Continuous
Length
29 ft
3 main spans
Daily traffic
2,628
2023 count
Owner
County
County Highway Agency

About this bridge

250th ST HWY 114 over Silver Creek is a concrete continuous culvert carrying 250th ST HWY 114 over Silver Creek in Minnehaha County, South Dakota. It was built in 2019, so it is 6 years old, younger than the South Dakota average of 48.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,628 vehicles a day, roughly 3% of them trucks, projected to reach 3,051 by 2038. The structure is 29 ft (8.9 m) long. If it were closed, the detour would be 8.1 mi (13 km).

Carries250th ST HWY 114
CrossesSilver Creek
Location0.5E Baltic
RouteCounty Highway 0
Coordinates43.76118, -96.72139
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert8 Very GoodNo problems noted.
Last inspectionJuly 2021
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating50.4 US tons
Inventory rating38.8 US tons

Structure

Structure typeCulvert
MaterialConcrete Continuous
DeckNot applicable
Main spans3
Design loadHL 93
Structure length29 ft (8.9 m)
Longest span9 ft (2.8 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,628 (2023)
Projected traffic3,051 by 2038
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed8.1 mi (13 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was 250th ST HWY 114 over Silver Creek built?

It was built in 2019, making it 6 years old in 2025.

What condition is 250th ST HWY 114 over Silver Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2021.

How much traffic does 250th ST HWY 114 over Silver Creek carry?

About 2,628 vehicles per day (2023 count), of which roughly 3% are trucks.

How long is 250th ST HWY 114 over Silver Creek?

The structure is 29 ft (8.9 m) long with a longest span of 9 ft (2.8 m).

Who owns 250th ST HWY 114 over Silver Creek?

It is owned by the County Highway Agency.