258th ST HWY 130 over Diversion Ditch
FairMinnehaha County, South Dakota · 0.7W Renner · Structure no. 000000050198140
- Built
- 1966
- 59 years old
- Condition
- Fair
- inspected July 2023
- Type
- Slab
- Concrete Continuous
- Length
- 67 ft
- 3 main spans
- Daily traffic
- 2,082
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
258th ST HWY 130 over Diversion Ditch is a concrete continuous slab carrying 258th ST HWY 130 over Diversion Ditch in Minnehaha County, South Dakota. It was built in 1966, so it is 59 years old, older than the South Dakota average of 48.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 2,082 vehicles a day, roughly 3% of them trucks, projected to reach 2,717 by 2038. The structure is 67 ft (20.4 m) long and 34 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was 258th ST HWY 130 over Diversion Ditch built?
It was built in 1966, making it 59 years old in 2025.
What condition is 258th ST HWY 130 over Diversion Ditch in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.
How much traffic does 258th ST HWY 130 over Diversion Ditch carry?
About 2,082 vehicles per day (2023 count), of which roughly 3% are trucks.
How long is 258th ST HWY 130 over Diversion Ditch?
The structure is 67 ft (20.4 m) long with a longest span of 25 ft (7.6 m) and a deck 34 ft wide.
Who owns 258th ST HWY 130 over Diversion Ditch?
It is owned by the County Highway Agency.