US Bridges

SD027 over Spain Ditch

Fair

Marshall County, South Dakota · 6.3 S JCT Sd 10 · Structure no. 000000046109163

Built
1977
48 years old
Condition
Fair
inspected June 2024
Type
Culvert
Concrete Continuous
Length
25 ft
2 main spans
Daily traffic
601
2024 count
Owner
State
State Highway Agency

About this bridge

SD027 over Spain Ditch is a concrete continuous culvert carrying SD027 over Spain Ditch in Marshall County, South Dakota. It was built in 1977, so it is 48 years old, younger than the South Dakota average of 48.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 601 vehicles a day, roughly 12% of them trucks, projected to reach 707 by 2044. The structure is 25 ft (7.5 m) long. If it were closed, the detour would be 24.9 mi (40 km).

CarriesSD027
CrossesSpain Ditch
Location6.3 S JCT Sd 10
RouteState Highway 27
Coordinates45.69998, -97.75163
Functional classRural Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment9: Superior to present desirable criteria
Operating rating64.3 US tons
Inventory rating38.5 US tons

Structure

Structure typeCulvert
MaterialConcrete Continuous
DeckNot applicable
Main spans2
Design loadHS 20
Structure length25 ft (7.5 m)
Longest span12 ft (3.7 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic601 (2024)
Projected traffic707 by 2044
Trucks12%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed24.9 mi (40 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SD027 over Spain Ditch built?

It was built in 1977, making it 48 years old in 2025.

What condition is SD027 over Spain Ditch in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.

How much traffic does SD027 over Spain Ditch carry?

About 601 vehicles per day (2024 count), of which roughly 12% are trucks.

How long is SD027 over Spain Ditch?

The structure is 25 ft (7.5 m) long with a longest span of 12 ft (3.7 m).

Who owns SD027 over Spain Ditch?

It is owned by the State Highway Agency.