419th Avenue over Spain Ditch
FairMarshall County, South Dakota · 0.5W & 5.9N of Langford · Structure no. 000000046070171
- Built
- 1971
- 54 years old
- Condition
- Fair
- inspected June 2023
- Type
- Channel Beam
- Concrete
- Length
- 25 ft
- 1 main span
- Daily traffic
- 16
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
419th Avenue over Spain Ditch is a concrete channel beam carrying 419th Avenue over Spain Ditch in Marshall County, South Dakota. It was built in 1971, so it is 54 years old, older than the South Dakota average of 48.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 16 vehicles a day, roughly 3% of them trucks, projected to reach 16 by 2032. The structure is 25 ft (7.6 m) long and 29 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was 419th Avenue over Spain Ditch built?
It was built in 1971, making it 54 years old in 2025.
What condition is 419th Avenue over Spain Ditch in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.
How much traffic does 419th Avenue over Spain Ditch carry?
About 16 vehicles per day (2022 count), of which roughly 3% are trucks.
How long is 419th Avenue over Spain Ditch?
The structure is 25 ft (7.6 m) long with a longest span of 23 ft (7 m) and a deck 29 ft wide.
Who owns 419th Avenue over Spain Ditch?
It is owned by the County Highway Agency.