Veterans Parkway over 85th Street
GoodLincoln County, South Dakota · .25E Minnesota Ave · Structure no. 000000042104020
- Built
- 2023
- 2 years old
- Condition
- Good
- inspected October 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 172 ft
- 1 main span
- Daily traffic
- —
- 2022 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Veterans Parkway over 85th Street is a prestressed concrete stringer/multi-beam or girder carrying Veterans Parkway over 85th Street in Lincoln County, South Dakota. It was built in 2023, so it is 2 years old, younger than the South Dakota average of 48.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
No traffic count is recorded. The structure is 172 ft (52.5 m) long and 104 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Veterans Parkway over 85th Street built?
It was built in 2023, making it 2 years old in 2025.
What condition is Veterans Parkway over 85th Street in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.
How much traffic does Veterans Parkway over 85th Street carry?
No traffic count is recorded for this structure.
How long is Veterans Parkway over 85th Street?
The structure is 172 ft (52.5 m) long with a longest span of 168 ft (51.2 m) and a deck 104 ft wide.
Who owns Veterans Parkway over 85th Street?
It is owned by the City or Municipal Highway Agency.