Cottonwood Road over Whitewater Ck
FairPosted for loadJackson County, South Dakota · 3.8S Cottonwood · Structure no. 000000036120059
- Built
- 1959
- 66 years old
- Condition
- Fair
- inspected September 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 207 ft
- 3 main spans
- Daily traffic
- 35
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
Cottonwood Road over Whitewater Ck is a steel stringer/multi-beam or girder carrying Cottonwood Road over Whitewater Ck in Jackson County, South Dakota. It was built in 1959, so it is 66 years old, older than the South Dakota average of 48.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 35 vehicles a day, roughly 3% of them trucks, projected to reach 35 by 2032. The structure is 207 ft (63.1 m) long and 32 ft wide. If it were closed, the detour would be 14.3 mi (23 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Cottonwood Road over Whitewater Ck built?
It was built in 1959, making it 66 years old in 2025.
What condition is Cottonwood Road over Whitewater Ck in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.
How much traffic does Cottonwood Road over Whitewater Ck carry?
About 35 vehicles per day (2022 count), of which roughly 3% are trucks.
How long is Cottonwood Road over Whitewater Ck?
The structure is 207 ft (63.1 m) long with a longest span of 79 ft (24.2 m) and a deck 32 ft wide.
Who owns Cottonwood Road over Whitewater Ck?
It is owned by the County Highway Agency.