US Bridges

Grindstone Road over Cottonwood Ck

Fair

Jackson County, South Dakota · 2W & 0.8N Cottonwood · Structure no. 000000036100012

Built
1976
49 years old
Condition
Fair
inspected September 2023
Type
Slab
Concrete Continuous
Length
76 ft
3 main spans
Daily traffic
41
2022 count
Owner
County
County Highway Agency

About this bridge

Grindstone Road over Cottonwood Ck is a concrete continuous slab carrying Grindstone Road over Cottonwood Ck in Jackson County, South Dakota. It was built in 1976, so it is 49 years old, older than the South Dakota average of 48.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 41 vehicles a day, roughly 2% of them trucks, projected to reach 41 by 2032. The structure is 76 ft (23.2 m) long and 30 ft wide. If it were closed, the detour would be 11.2 mi (18 km).

CarriesGrindstone Road
CrossesCottonwood Ck
Location2W & 0.8N Cottonwood
RouteCounty Highway 0
Coordinates43.97819, -101.93964
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadUnknown
Structure length76 ft (23.2 m)
Longest span25 ft (7.6 m)
Deck width30 ft (9.2 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic41 (2022)
Projected traffic41 by 2032
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed11.2 mi (18 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$10,000
NavigationNo navigation control on waterway

Frequently asked questions

When was Grindstone Road over Cottonwood Ck built?

It was built in 1976, making it 49 years old in 2025.

What condition is Grindstone Road over Cottonwood Ck in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.

How much traffic does Grindstone Road over Cottonwood Ck carry?

About 41 vehicles per day (2022 count), of which roughly 2% are trucks.

How long is Grindstone Road over Cottonwood Ck?

The structure is 76 ft (23.2 m) long with a longest span of 25 ft (7.6 m) and a deck 30 ft wide.

Who owns Grindstone Road over Cottonwood Ck?

It is owned by the County Highway Agency.