Marty RD over North Fork Moreau Rv
FairPosted for loadHarding County, South Dakota · 19.6E 1.0S of Redig · Structure no. 000000032446480
- Built
- 1986
- 39 years old
- Condition
- Fair
- inspected April 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 79 ft
- 1 main span
- Daily traffic
- 31
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
Marty RD over North Fork Moreau Rv is a steel stringer/multi-beam or girder carrying Marty RD over North Fork Moreau Rv in Harding County, South Dakota. It was built in 1986, so it is 39 years old, younger than the South Dakota average of 48.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 31 vehicles a day, roughly 2% of them trucks, projected to reach 31 by 2032. The structure is 79 ft (24.1 m) long and 20 ft wide. If it were closed, the detour would be 14.3 mi (23 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Marty RD over North Fork Moreau Rv built?
It was built in 1986, making it 39 years old in 2025.
What condition is Marty RD over North Fork Moreau Rv in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.
How much traffic does Marty RD over North Fork Moreau Rv carry?
About 31 vehicles per day (2022 count), of which roughly 2% are trucks.
How long is Marty RD over North Fork Moreau Rv?
The structure is 79 ft (24.1 m) long with a longest span of 79 ft (24.1 m) and a deck 20 ft wide.
Who owns Marty RD over North Fork Moreau Rv?
It is owned by the County Highway Agency.