State Highway 47 over Big Bend Dam Spillway
FairBuffalo County, South Dakota · 1 Mi. So. of Ft. Thompson · Structure no. CEPMROSD0000008
- Built
- 1963
- 62 years old
- Condition
- Fair
- inspected September 2023
- Type
- Girder and Floorbeam System
- Steel
- Length
- 135 ft
- 9 main spans
- Daily traffic
- 676
- 2022 count
- Owner
- Federal
- Corps of Engineers (Civil)
About this bridge
State Highway 47 over Big Bend Dam Spillway is a steel girder and floorbeam system carrying State Highway 47 over Big Bend Dam Spillway in Buffalo County, South Dakota. It was built in 1963, so it is 62 years old, older than the South Dakota average of 48.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 676 vehicles a day, roughly 32% of them trucks, projected to reach 350 by 2040. The structure is 135 ft (41.1 m) long and 12 ft wide. If it were closed, the detour would be 96.9 mi (156 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was State Highway 47 over Big Bend Dam Spillway built?
It was built in 1963, making it 62 years old in 2025.
What condition is State Highway 47 over Big Bend Dam Spillway in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.
How much traffic does State Highway 47 over Big Bend Dam Spillway carry?
About 676 vehicles per day (2022 count), of which roughly 32% are trucks.
How long is State Highway 47 over Big Bend Dam Spillway?
The structure is 135 ft (41.1 m) long with a longest span of 16 ft (4.9 m) and a deck 12 ft wide.
Who owns State Highway 47 over Big Bend Dam Spillway?
It is owned by the Corps of Engineers (Civil).