SD037 over Crow Ck Ditch
FairBrown County, South Dakota · 7.0 S JCT Sd 10 · Structure no. 000000007300169
- Built
- 1961
- 64 years old
- Condition
- Fair
- inspected June 2024
- Type
- Slab
- Concrete Continuous
- Length
- 117 ft
- 5 main spans
- Daily traffic
- 836
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
SD037 over Crow Ck Ditch is a concrete continuous slab carrying SD037 over Crow Ck Ditch in Brown County, South Dakota. It was built in 1961, so it is 64 years old, older than the South Dakota average of 48.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 836 vehicles a day, roughly 29% of them trucks, projected to reach 1,109 by 2044. The structure is 117 ft (35.7 m) long and 34 ft wide. If it were closed, the detour would be 42.3 mi (68 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SD037 over Crow Ck Ditch built?
It was built in 1961, making it 64 years old in 2025.
What condition is SD037 over Crow Ck Ditch in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.
How much traffic does SD037 over Crow Ck Ditch carry?
About 836 vehicles per day (2024 count), of which roughly 29% are trucks.
How long is SD037 over Crow Ck Ditch?
The structure is 117 ft (35.7 m) long with a longest span of 23 ft (7.1 m) and a deck 34 ft wide.
Who owns SD037 over Crow Ck Ditch?
It is owned by the State Highway Agency.