S-43-528 over Cane Savannah Creek
FairPosted for loadSumter County, South Carolina · 5 MI SW of Sumter · Structure no. 000000000006196
- Built
- 1972
- 53 years old
- Condition
- Fair
- inspected May 2024
- Type
- Slab
- Concrete
- Length
- 90 ft
- 6 main spans
- Daily traffic
- 2,100
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
S-43-528 over Cane Savannah Creek is a concrete slab carrying S-43-528 over Cane Savannah Creek in Sumter County, South Carolina. It was built in 1972, so it is 53 years old, older than the South Carolina average of 48 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 2,100 vehicles a day, roughly 3% of them trucks, projected to reach 2,625 by 2043. The structure is 90 ft (27.4 m) long and 33 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was S-43-528 over Cane Savannah Creek built?
It was built in 1972, making it 53 years old in 2025.
What condition is S-43-528 over Cane Savannah Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.
How much traffic does S-43-528 over Cane Savannah Creek carry?
About 2,100 vehicles per day (2023 count), of which roughly 3% are trucks.
How long is S-43-528 over Cane Savannah Creek?
The structure is 90 ft (27.4 m) long with a longest span of 15 ft (4.6 m) and a deck 33 ft wide.
Who owns S-43-528 over Cane Savannah Creek?
It is owned by the State Highway Agency.