US Bridges

Sc 110 over I-85

Good

Spartanburg County, South Carolina · 2 MI N of Cowpens · Structure no. 000000000010412

Built
2020
5 years old
Condition
Good
inspected November 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
197 ft
2 main spans
Daily traffic
6,800
2023 count
Owner
State
State Highway Agency

About this bridge

Sc 110 over I-85 is a prestressed concrete continuous stringer/multi-beam or girder carrying Sc 110 over I-85 in Spartanburg County, South Carolina. It was built in 2020, so it is 5 years old, younger than the South Carolina average of 48 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 6,800 vehicles a day, roughly 12% of them trucks, projected to reach 11,288 by 2043. The structure is 197 ft (59.9 m) long and 64 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesSc 110
CrossesI-85
Location2 MI N of Cowpens
RouteState Highway 110
Coordinates35.04397, -81.81687
Functional classRural Principal Arterial - Other

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating46.4 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length197 ft (59.9 m)
Longest span98 ft (30 m)
Deck width64 ft (19.4 m)
Roadway width60 ft (18.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6,800 (2023)
Projected traffic11,288 by 2043
Trucks12%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Sc 110 over I-85 built?

It was built in 2020, making it 5 years old in 2025.

What condition is Sc 110 over I-85 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.

How much traffic does Sc 110 over I-85 carry?

About 6,800 vehicles per day (2023 count), of which roughly 12% are trucks.

How long is Sc 110 over I-85?

The structure is 197 ft (59.9 m) long with a longest span of 98 ft (30 m) and a deck 64 ft wide.

Who owns Sc 110 over I-85?

It is owned by the State Highway Agency.