S-42-525 over Sc 85
PoorSpartanburg County, South Carolina · 4.0 MI W Spartanburg · Structure no. 000000000002852
- Built
- 1958
- 67 years old
- Condition
- Poor
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 250 ft
- 4 main spans
- Daily traffic
- 9,500
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
S-42-525 over Sc 85 is a prestressed concrete stringer/multi-beam or girder carrying S-42-525 over Sc 85 in Spartanburg County, South Carolina. It was built in 1958, so it is 67 years old, older than the South Carolina average of 48 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
It carries about 9,500 vehicles a day, roughly 5% of them trucks, projected to reach 14,250 by 2043. The structure is 250 ft (76.2 m) long and 32 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was S-42-525 over Sc 85 built?
It was built in 1958, making it 67 years old in 2025.
What condition is S-42-525 over Sc 85 in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in August 2024.
How much traffic does S-42-525 over Sc 85 carry?
About 9,500 vehicles per day (2023 count), of which roughly 5% are trucks.
How long is S-42-525 over Sc 85?
The structure is 250 ft (76.2 m) long with a longest span of 65 ft (19.8 m) and a deck 32 ft wide.
Who owns S-42-525 over Sc 85?
It is owned by the State Highway Agency.