S-41-98 over Trib to Halfway Swp Ck
FairSaluda County, South Carolina · 9.7MI NW Saluda · Structure no. 000000000002251
- Built
- 1973
- 52 years old, rebuilt 2005
- Condition
- Fair
- inspected August 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 60 ft
- 2 main spans
- Daily traffic
- 450
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
S-41-98 over Trib to Halfway Swp Ck is a prestressed concrete stringer/multi-beam or girder carrying S-41-98 over Trib to Halfway Swp Ck in Saluda County, South Carolina. It was built in 1973 and reconstructed in 2005, so it is 52 years old, older than the South Carolina average of 48 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 450 vehicles a day, roughly 16% of them trucks, projected to reach 657 by 2043. The structure is 60 ft (18.3 m) long and 34 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was S-41-98 over Trib to Halfway Swp Ck built?
It was built in 1973, making it 52 years old in 2025. It was reconstructed in 2005.
What condition is S-41-98 over Trib to Halfway Swp Ck in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.
How much traffic does S-41-98 over Trib to Halfway Swp Ck carry?
About 450 vehicles per day (2023 count), of which roughly 16% are trucks.
How long is S-41-98 over Trib to Halfway Swp Ck?
The structure is 60 ft (18.3 m) long with a longest span of 30 ft (9.1 m) and a deck 34 ft wide.
Who owns S-41-98 over Trib to Halfway Swp Ck?
It is owned by the State Highway Agency.